| Canada Line
8/22/09 |
Vancouver's Canada Line Skytrain opened on August 17,
three months ahead of schedule. The Line adds 19 km
and 16 stops to the Skytrain system and despite the name,
all the stops from Waterfront to Langara are underground.
The Line does not connect with the existing system,
as it is a bigger gauge.